 |  |
FAR EAST OF RUSSIA, SAKHALIN SHELF
Sakhalin I project
Period: from 1996 to the present day
Customer: Exxon Neftegas (Exxon Mobil and Rosneft)
Work on field exploration, development and exploitation stages:
- Navigational and geodetic support of mobile rig on stage of exploratory drilling
- Surveys for offshore constructions and pipelines
- Navigational and hydrographic support of rig moving to the installation point
- Placing the drilling platform in a final position
- As-built survey of drilling platform position
- Support of off-shore trenching and pipeline trenching
- Annual inspection of submarine pipelines, fixed offshore platform base and SPM
Sakhalin II project
Period: from 1997 to the present day
Customer: Sakhalin Energy ( JSC Gazprom and Shell Company)
Work on stages of field development, exploitation and exploitation of PA-A, PA-B and LUN-A platforms:.
- Navigational and geodetic support of mobile rig on stage of exploratory drilling
- Surveys for offshore constructions and pipelines
- Navigational and hydrographic support of rig moving to the installation point
- Placing the drilling platform in a final position
- As-built survey of drilling platform position
- Underwater inspection and technical maintenance of underwater facilities and equipment with divers and ROVs (remotely operated vehicles)
Sakhalin III project
Period: from 2006 to the present day
Customer: Venineft (Rosneft and Sinopec)
Work on field exploration stage:
- Navigational and geodetic support of mobile rig
Sakhalin IV and Sakhalin V projects
Period: 2003-2008
Customer: Elvary Neftegaz (Rosneft and British Petroleum)
Work on stage of field exploration:
- Navigational and geodetic support of mobile rigs
- Surveys for mobile offshore drilling unit installation
- Meteorological and Oceanographic data collection, processing and analysis
Period: 2008
Customer: Khamchatneftegaz (Rosneft and KNOC)
Work on exploration stage:
- Current measurement in real time mode
VIETNAM SHELF
Period: from 1991 to the present day
Customer: Vietsovpetro
Work on exploration, construction and exploitation stages in«White Tiger» and «Dragon» fields:
- Engineering survey works and navigational and geodetic support of mobile rigs
- Engineering surveys
- Jackup rig and SPM installation and putting into operation
- Pipeline laying support
- Imagery survey and inspection of underwater facilities
Period: from 1996 to the present day
Customer: Japan Vietnam Petroleum Company
Work on exploration, construction and exploitation stage in «Rang Dong»field:
- Exploration drilling
- Navigational and geodetic support of mobile rig
- Jackup rigs and SPM installation and putting into operation
- Pipeline laying support
- Imagery survey and inspection of underwater facilities
Period: 1998-2007
Customer: Unocal Company
Work on exploration stage:
- Navigational and geodetic support of mobile rigs durin exploration drilling
PERSIAN GULF, QATAR SHELF
Period: 2005-2007
Customer: Maersk Oil Company
Work on exploitation stage:
- Annual inspection of underwater facilities
THAILAND
Period: 1998-2008
Customer: Chevron Company
Work on construction and exploitation stages:
- Navigational and geodetic support of mobile rigs during exploration drilling
- Navigational support of barge and vessel during anchor laying
MYANMAR
Period: 2005-2008
Customer: Daewoo E&P Company
Survey works on company’s project:
- Navigational and geodetic support of mobile rigs during exploration drilling
CASPIAN REGION
Period: 2005-2007
Customer: Dragon Oil Company
Work on exploitation stage:
- Fixed offshore platform installation and putting it into operation on Turkmenistan shelf
Period: from 2007 to the present day
Customer: BP Company
Work on development stage on Azerbaijan shelf:
- Navigational and geodetic support of mobile rig moving on offshore drilling site
|
|
 |