Track records ROMONA Inc

LONG TERM CONTRACTS:

  • 2018-2023: Visual inspection of the Exxon Neftegas Limited pipeline using unmanned aerial vehicles (UAVs) «Orlan-10».
  • 2018-2019: Inspection of the technical condition of the gas pipeline “Oktyabrsky-Khabarovsk” using the unmanned aerial vehicle “Supercam S350″ for Daltransgaz Inc.
  • 2013-2018: Navigation and hydrographic support during pipelines installation project in Filanovsky field, Caspian Sea. Client “Bumi Armada Caspian” working for “Lukoil”. Works successfully completed in 2013 and 2014. Based on ROMONA perfprmance the contract was extended and work will be continued in 2016.
  • 2007-2018: Annual pipelines and platforms inspection for Exxon Neftegas Limited (Sakhalin-1 Project). Additional site surveys on Arkutun-Dagi pipline route and Berkut platform Site were completed in 2007 and 2009.
  • 2008-2017: Annual pipelines and platforms inspection for Sakhalin Energy Investment Company Ltd. (Sakhalin-2 Project). Inspection performed using acoustic survey vessel and DP2 vessel with Work Class ROV in partnership with Mermaid Subsea Services. Ltd.
  • 2007-2016: Long term contract with BP Exploration (Caspian Sea) Limited for Semi-Submersible rig moves in Caspian Sea, offshore Azerbaijan (Dada Gorgud, Istiglal, Heydar Aliyev rigs).
  • 1996-2006: Exploration, Development and Production phases of Exxon Neftegas Limited Sakhalin-1 Project, including exploration drilling rig move positioning; engineering route and site surveys; gravity platform towing, installations and commissioning; hydrographical dredging surveys; pipe-lay survey support, subsea facilities surveys and inspections.
  • 1997-2007: Exploration, Development and Production phases of Sakhalin Energy Investment Company Ltd. Sakhalin-2 Project, including exploration drilling rig move positioning; engineering route and site surveys; platform gravity bases and top sides towing, installation and commissioning; hydrographical dredging surveys; subsea facilities surveys and inspections.
  • 2003-2007: Exploration phase of Rosneft-BP Alliance’s Sakhalin-4 & 5 Projects, including exploration drilling site surveys and rig move positioning; metocean data collection, processing and analysis, as Rosneft-BP’s contractor.

2019:

  • Monitoring of the ice situation in Chikhachev Bay using unmanned aerial vehicles (UAVs) “Supercam S350” for Exxon Neftegas Limited.

2018:

  • Complex of scientist marine surveys in the Nevelskogo Strait – as the first stage of “Bridge Construction Project”.  The surveys were performed by survey vessel “Ivan Kireev”, measuring catamaran and onshore survey team.

  • Engineering-geodetic works on monitoring of head of wells, operated by “Exxon Neftegas Limited”.

  • Pipelines inspection in the Piltun Bay for “Exxon Neftegas Limited”.

  • Complex of engineering-hydro meteorological surveys in the Chikhacheva Bay for “Exxon Neftegas Limited”. The surveys were performed by survey vessel “Ivan Kireev” and onshore survey team. Hydro meteorological data collection for assessment of LNG construction in the De-Kastri district.

2017:

  • Site survey in the Chikhacheva bay for “Exxon Neftegas Limited”. The survey was performed by survey vessel Ivan Kireev and onshore survey team. Various data acquisition continues, including geophysical, geotechnical and hydrographic information to assess the conditions of the LNG plant construction near the De-Kastri.

    Shelf Pipeline Geophysical And Platform 2D-UHR Surveys offshore Vietnam for ExxonMobil Exploration & Production Vietnam Limited. The survey was performed by survey vessel Ivan Kireev. Digital and analog geophysical data collected in course of the project will allow Customer to design the underwater pipeline routes and platform installation areas.

    UXO Survey offshore Vietnam for Van Oord. Collected megnetometric data will be used for  dredging operation preparations.

2015:

  • Site survey in the Chikhacheva bay for “Exxon Neftegas Limited”. The survey was performed by survey vessel Ivan Kireev and onshore survey team. Various data acquisition continues, including geophysical, metocean and ice observations to assess the conditions of the LNG plant construction near the De-Kastri. Unmanned aerial vehicles Supercam 350 have been used throughout the ice period to monitor the ice situation.
  • Site survey in the Tatar Strait for the company “Exxon Neftegas Limited”. The survey was performed by survey vessel Ivan Kireev and onshore survey team. Collected various types of data, including geophysical and metocean observations, to assess the conditions of the LNG plant construction near the village Ilinskoe.

2014:

  • Site survey in Okhotsk sea, Dukchinskaya and Shelikanskaya structures for Magadanmorneftegas (Joint Venture between Rosneft and Statoil). The survey was performed by research vessel Ivan Kireev.More than 1200 line kilometers of survey (HRS, UHRS, SBP, MBES, SSS and MAG) and 44 locations of vibrocore were completed between end of August – beginning of September. Data processing performed in Moscow in cooperation with Largeo. Data interpretation and reporting done in Moscow office of ROMONA..
  • Semi-submersible rig West Alpha move in Kara Sea under the contract with Karmorneftegas (Joint Venture between Rosneft and Exxonmobil). The rig was successfully positioned on the first Arctic exploration well in Kara Sea. 14 vessels supported this project and ROMONA provided 12 surveyors and state of art equipment for positioning and navigation for all fleet involved in this project. Final rig positioning was established using GLONASS and GPS systems. Despite of difficulties for precise positioning in high latitudes ROMONA personnel successfully completed the project. Final position of the rig was less than 2m from intended location..
  • Site surveys in Kara Sea, Rogozinskaya, Universitetskaya and Vilkitskogo structures and 4 Unloading and Stand by sites for the Jack Up Rig for Karmorneftegas (Joint Venture between Rosneft and Exxonmobil). The project was done in partnership with Calecore Ltd. using 2 geophysical vessels (Kommandor Stuart, Kommandor Calum) and one geotechnical vessel (Highland Spirit). More than 2400 line kilometers of survey (HRS, UHRS, SBP, MBES, SSS and MAG) and around 1500 of geotechnical drilling (including CPT) were completed between end of July – middle of October. Data processing performed in Moscow in cooperation with Largeo. Data interpretation and reporting done in Moscow office of ROMONA.

2013:

  • Site surveys in Kara Sea, Rogozinskaya, Universitetskaya, Nansenovskaya and Vikulovskaya structures for Rosneft-Shelf Far East. The project was done in partnership with Calecore Ltd. using 1 geophysical vessel (Kommandor Stuart) and one geotechnical vessel (Highland Spirit). More than 1700 line kilometers of survey (HRS, UHRS, SBP, MBES, SSS and MAG) and around 500 of geotechnical drilling (including CPT) were completed between beginning of August – middle of October. Data processing performed in Moscow in cooperation with Largeo. Data interpretation and reporting done in Moscow office of ROMONA.